Technical concept & presentation
A terminal designed for flexibility, speed, and simultaneous operations — to European standards, in the river-sea area of the Port of Constanța.
A terminal designed for flexibility, speed, and simultaneous operations — to European standards, in the river-sea area of the Port of Constanța.
The GPO Terminal covers 9,714 m² on Plot 36.1, Dana 97, in the river-sea area of the Port of Constanța. The investment objective is to create a modern liquid products terminal to European standards, increasing the share of liquid cargo transported by water and the volumes handled in the port.
Unlike existing terminals, predominantly focused on petroleum products and operated by state-owned companies, GPO offers a predictable commercial environment, modern technology, and the ability to handle three product categories simultaneously — liquid bitumen, biodiesel, and liquid fertilizers — with no technological losses and no risk of cross-contamination.
The terminal configuration allows a vessel to be discharged into a tank in parallel with loading other products into road tankers and rail wagons — without one process blocking the other.
Tank unloading rates: 250–300 mc/h, using the vessel’s own pumps, via marine loading arm (bitumen) or flexible DN250–DN300 hoses (biodiesel, fertilizers).
Two simultaneous bays, full/empty metrological weighing, arms or DN80 hoses, rates of 80–100 mc/h, controlled via mass metering.
90 m internal rail facility, parking capacity of 6 wagons, loading rates of up to 250 mc/h, fixed weighing at entry.
All processes are monitored and coordinated by a single dispatcher from the administrative building, via the SCADA system. Transport documents (CMR, consignment notes) are generated automatically at the end of the operation.
From vessel berthing to issuing transport documents, all stages are standardized and automated.
Loading river vessels from the terminal follows the same principle, in reverse.
Nine technical elements integrated into a single automated flow.
6 storage tanks (5,000 m³) + 1 operational bitumen tank (500 m³).
Product-dedicated process pipelines, with short routes and thermal insulation where needed.
90 m operating ramp, 6-wagon capacity, with fixed weighing at entry.
10 canned pumps, product-dedicated, with temperature, vibration, and displacement sensors.
Fire pump house and firewater tank, 40-minute autonomy in accordance with legislation.
Thermal oil for the bitumen heating circuits.
2 loading/unloading bays + 2 metrologically certified scales.
Administrative building (300 m², G+1) with control room and video monitoring system.
Access roads, concrete platform, containment bund for tanks.
The project meets current European requirements and delivers a positive impact by reducing emissions and ensuring the availability of imported products via maritime transport.
All design, permitting, and authorization stages were completed in December 2024, in line with current national and European legislation.
Transporting products by water, in large volumes, reduces emissions per tonne/kilometer significantly compared to long-distance road or rail transport.
The project is part of EU priority axes in the transport sector and is eligible for non-reimbursable funding of over 50%.
Three complementary perspectives on the investment.
Dana 97, Plot 36.1 — true multimodal access (sea, river, rail, road).