Operations & Equipment
From berthing to delivery: vessel unloading, truck and rail loading, pumping and transfer — all in a fully automated, monitored flow.
From berthing to delivery: vessel unloading, truck and rail loading, pumping and transfer — all in a fully automated, monitored flow.
Dana 97 is the GPO terminal’s operating berth, where seagoing vessels berth to unload liquid products and where inland waterway units can also be loaded.
Located on the eastern side of the terminal, the truck rack can handle two tank trucks simultaneously.
90 m internal rail track, capable of handling 6 wagons simultaneously.
Located in its own containment bund, it includes 10 canned pumps dedicated to each product.
Dedicated pipelines for each product, fully segregated, with short routes between all facilities.
Send us the product type, annual volume, and transport modes — we’ll get back to you with a technical and commercial proposal.